Location | Limitation | Location of constraint (start) | Location of constraint (end) | Network Element | Evoenergy Feeder Reference | Residential customers affected | Residential customers affected* | Asset rating (MVA)* | Forecast Demand 2024 (MVA) | Forecast Demand 2025 (MVA) | Forecast Demand 2026 (MVA) | Forecast Demand 2027 (MVA) | Forecast Demand 2028 (MVA) | Voltage level | Maximum Load at risk 2024 (MVA) | Maximum Load at risk 2025 (MVA) | Maximum Load at risk 2026 (MVA) | Maximum Load at risk 2027 (MVA) | Maximum Load at risk 2028 (MVA) | Energy at risk 2024 (MWhr) | Energy at risk 2025 (MWhr) | Energy at risk 2026 (MWhr) | Energy at risk 2027 (MWhr) | Energy at risk 2028 (MWhr) | Preferred network investment | Preferred network investment capital cost | Preferred annual network investment operating cost | Preferred network investment cost accuracy | Preferred network investment cost accuracy | Proposed timing | Demand reduction required to defer investment by 1 year | Annual Deferral Value | Load transfer capability * | Emergency generation | Historic use of existing emergency response | Historic load trace | Historic asset rating |
---|
2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | 2029 | ||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Type | Voltage | Unit | 10% (W) | 50% (W) | 10% (W) | 50% (W) | 10% (S) | 50% (S) | 10% (W) | 50% (W) | 10% (S) | 50% (S) | 10% (W) | 50% (W) | 10% (S) | 50% (S) | 10% (W) | 50% (W) | 10% (S) | 50% (S) | 10% (W) | 50% (W) | 10% (S) | 50% (S) | 10% (W) | 50% (W) | 10% (S) | 50% (S) | 10% (W) | 50% (W) | 10% (S) | 50% (S) | 10% (W) | 50% (W) | 10% (S) | 50% (S) | 10% (W) | 50% (W) | 10% (S) | 50% (S) | 10% (W) | 50% (W) | 10% (S) | 50% (S) | 10% (W) | 50% (W) | 10% (S) | 50% (S) |
Date | Time | kw |
---|